Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Excavator Attachment - Tree Shear Safe Work Method Statement
Excavator Attachment - Tree Shear Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Excavator Attachment - Tree Shear  Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure. This SWMS covers the use of a Tree Shear when attached to an excavator. This SWMS must be used in conjunction with Safety Culture’s Excavator SWMS.

The Excavator Attachment - Tree Shear   procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Excavator Attachment - Tree Shear,   Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Excavator Attachment - Tree Shear, Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Pre-operational Inspection
  • Connecting Attachment
  • Operation
  • On Completion
  • Maintenance
  • Emergency Procedures
  • References
Product Details:
  • 9 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:
Connecting Attachment:

Attach per manufacturer’s instructions. Example:
  • Ensure attachment is level
  • With jaws of shear facing excavator, operate the excavator into proper position, lining the boom into the top bracket pivot of the shear.
  • Pin the excavator arm and shear top bracket pivot together
  • Pick the shear up where the 2nd linkage pin can be inserted. Insert pin. 
  • Connect hydraulic hoses as required. Tighten bolts/cap to proper torque.
  • Ensure all locking pins are secured in place. 
  • Check correct flow and pressure (as per manufacturer). 
  • Remove non-essential persons from area
  • Operator to raise excavator arm slowly and test attachment is secured for use. Slowly try the rotate and open/close functions. Check for oil leaks.

Price: $49.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Large Excavators Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.Large Excavators Safe Work Procedure Or Work Method Statement. Ready For Download. Largest Online Safety Library.
Large Excavators Safe Work Procedure or Work Method Statement
Bobcat loader, skid steer work method statement, safe work procedure, standard operating procedureBobcat loader, skid steer work method statement, safe work procedure, standard operating procedure
Bobcat - Skidsteer SWP
Backhoe or Front End Loader Safe Work Procedure (CLONE)Backhoe or Front End Loader Safe Work Procedure (CLONE)
Backhoe or Front End Loader Safe Work Procedure
Dozer Operations Safe Work Method StatementDozer Operations Safe Work Method Statement
Dozer Operations Safe Work Method Statement