Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Plumbing Fit-off Safe Work Method Statement
Plumbing Fit-off Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Plumbing Fit-off Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure.  This SWMS covers plumbing fit-off tasks, such as attaching fittings (taps, toilets, shower heads etc). This does NOT include installation of gas powered appliances and air-condition-heating units or other works as defined as Plumbing Works” in the Plumbing Regulations 2008.

The Plumbing Fit-off procedure,  is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Plumbing Fit-off Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Plumbing Fit-off Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Operation
  • Emergency Procedures
  • References

Product Details:
  • 8 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:
  • Manual Handling

Planning:

Liaise with Principal Contractor. Ensure following is provided before work commences:
  • Site specific induction (include location of amenities, first aid facilities, emergency plans and evacuation points, incident reporting, communication, contact persons etc)
  • Health and Safety Rules for site
  • Supervisory arrangements
  • PPE requirements for site (hard hat, high visibility clothing, safety boots, etc)
  • Types of hazards at site
  • Site plans – showing no go zones for pedestrians
  • Traffic Management plans
  • Relevant SWMS and JSA's
  • Site security requirements

Ensure all persons entering construction site have a Construction Induction Card (or equivalent). 

Ensure Principal has communicated presence of fit-off  personnel to other operators as required. 

Develop a site and task specific SWMS. 

Obtain certification that residence is cleared for persons to enter.  

Obtain evidence that electrical power is isolated if required.

Price: $79.95 


Quantity:   




Plumbing Hot & Cold Water Rough In Safe Work Method StatementPlumbing Hot & Cold Water Rough In Safe Work Method Statement
Plumbing Hot & Cold Water Rough In Safe Work Method Statement
Suspended Sanitary Waste Safe Work Method StatementSuspended Sanitary Waste Safe Work Method Statement
Suspended Sanitary Waste Safe Work Method Statement
working on roofs, safe work, rooves, height safety, construction site safetyworking on roofs, safe work, rooves, height safety, construction site safety
Working On Roofs Above 2m Safe Work Procedure
Trench Work Safe Work Procedureworking in trenches, trench safety, ohs trench work, trench shield, ohs trench work
Trench Work Safe Work Procedure