Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Storm Water Drains Vacuumation Safe Work Method Statement
Storm Water Drains Vacuumation Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Storm Water Drains Vacuumation Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure. This SWMS covers the cleaning of storm water drains using vacuumation processes. Where entry into drain system is required, an assessment must take place to determine whether the area is a “confined space”. 

If a confined space is determined, use SafetyCulture's Confined Space Entry SWMS. This SWMS does not cover confined space entry. 

The Storm Water Drains Vacuumation procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Storm Water Drains Vacuumation Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Vacuumation of Storm Water Drains Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre- Operational Inspection
  • Operation
  • Waste Disposal
  • Emergency Procedures
Product Details:
  • 11 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:
Manual Handling

Planning

Ensure all permits obtained (as applicable). Examples:
  • EPA Approval for Waste Truck
  • EPA Licensed Drivers
  • Local Council permits
  • Confined Space Entry Permit
  • If working in residential area – consult with residents about the work taking place in a polite and professional manner. Obtain written consent from Coordinating Road Authority if applicable. Example:
  • Minor works with no traffic impact = no consent required.
  • Where traffic is impacted, consent is required.
  • Roads other than freeways, minor works = no consent. 

Price: $79.95 


Quantity:   




Suspended Sanitary Waste Safe Work Method StatementSuspended Sanitary Waste Safe Work Method Statement
Suspended Sanitary Waste Safe Work Method Statement
scaffolding safety, safe work procedure work method statementscaffolding safety, safe work procedure work method statement
Scaffolding Safe Work Procedure
Trench Work Safe Work Procedureworking in trenches, trench safety, ohs trench work, trench shield, ohs trench work
Trench Work Safe Work Procedure
Working Around Electricity Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.Working Around Electricity Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.
Working Around Electricity Safe Work Procedure or Work Method Statement