![]() |
The Metal Door Frames Safe Work Method Statement (SWMS) is a comprehensive 16 page procedure. This SWMS covers the modification and installation of metal door frames.
The Metal Door Frames procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Metal Door Frames Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Metal Door Frames Safety Procedure includes:
Product Details:
Related items:
Manual Handling
Planning:
Liaise with Site Supervisor. Ensure following is provided before work commences:
Ensure all persons entering construction site have a Construction Induction Card (or equivalent).
Ensure suitable Material Safety Data Sheets (MSDS) are obtained for shielding gas used (and other chemicals as relevant)
Note: MSDS must be obtained from the manufacturer and issued within the last 5 years.
Price: $79.95 |
![]()
|





