Aluminium Handrail Installation Installation Safe Work Method Statement
Handrail Installation Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Aluminium Handrail Installation Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for Installing Aluminium Handrails.

This SWMS covers installation of pre-fabricated, aluminium handrails for permanent structures. This does not include installation of temporary perimeter protection for the prevention of falls at construction sites.

The Aluminium Handrail Installation procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Aluminium Handrail Installation Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Aluminum Handrail Installation Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Transport
  • Installation
  • Completion
  • Emergency Procedures
  • References
Product Details:
  • 9 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • E-mailed out

Related items:

Planning

Assess intended work site. Ensure:
  • adequate lighting
  • sufficient room for employee and materials
  • suitable work platform
  • suitable weather conditions
  • traffic management controls are in place where required (barriers, exclusion zones etc)
  • location is not in close proximity to other hazardous works (hot works, excavating, work overhead etc)
  • Fall risks are mitigated (barriers, fall prevention etc)
  • Emergency/Rescue Plan in place 
  • Area is restricted to prevent unauthorised access
  • Kickboards/catch nets are installed as required

Price: $79.95 


Quantity:   




Air Compressor safety, work method statement, OHS, OH&S Procedure, air toolsAir Compressor safety, work method statement, OHS, OH&S Procedure, air tools
Air Compressor - Trailer Safe Work Procedure
Asbestos Removal - Non Friable Safe Work ProcedureAsbestos Removal - Non Friable Safe Work Procedure
Asbestos Removal - Non Friable Safe Work Procedure
Asbestos Removal - Friable Safe Work Method StatementAsbestos Removal - Friable Safe Work Method Statement
Antenna and Satellite Installation
Animal Management - Mustering Safe Work Method Statement
Animal Management - Mustering Safe Work Method Statement