![]() |
The Hydro Evacuation Truck Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure.
Preliminary discussions are to be held prior to the commencement of the activity to ensure that all work related hazards have been identified and suitable risk control strategies have been implemented. Consider traffic obstructions, pedestrian interaction, weather conditions, overhead obstructions (power- lines, phone cables, overhanging branches) and confined space entry. Where a hazard exists and risk control measures are not suitable, clarification should be sought from Head Office or the relevant Client Contact
The Hydro Evacuation Truck procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Hydro Evacuation Truck Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Hydro Evacuation Truck Safety Procedure includes:
Product Details:
Related items:
Job Preparation
Check that all applicable safety equipment is available and in safe working condition including:
Pre-inspect all equipment ensuring that:
Visually check the work area for:
Price: $79.95 |





