![]() |
The Photography Booth - Mobile Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure.
This SMWS covers general safety issues involved with mobile photography booths (such as Santa booth) for operation within a Shopping Centre, where photos are printed from a photo-quality printer. This does not include the development of photographs using chemicals.
The Photography Booth - Mobile procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Photography Booth - Mobile Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Mobile Photography Booth Work Method Statement includes:
PPE
Safety Notes
Planning
Preparation
Pre-operational Inspection
Operation
Maintenance
Emergency Procedures
References
Product Details:
8 Page procedure
Written by ex WHS inspectors
Referenced
Risk ratings before and after control measures
MS Word format NOT PDF
Task specific and site specific details easy to add
Includes easy to complete boxes for Company details and project details
Employee sign off section
Instant download delivery
Related items:
Manual Handling
Preparation
Ensure employees are provided with clear guidance and training relating to the following:
Ensure the following is provided:
Establish written procedures for dealing with clients. Include:
Price: $79.95 |
![]()
|





