Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Asbestos Safety - Working in Roofs Safe Work Method Statement
Asbestos Safety - Working in Roofs Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Asbestos Safety - Working in Roofs Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure. 

This SMWS covers conducting work inside the roof space of an existing structure where non-friable asbestos containing material (ACM) is present.  This SWMS does NOT cover working around friable asbestos (such as pipe lagging and/or insulation).

The Asbestos Safety - Working in Roofs procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Asbestos Safety - Working in Roofs Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Asbestos Safety - Working in Roofs Work Method Statement includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Operation
  • On Completion
  • Emergency Procedures
  • References
Product Details:
  • 11 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Safety Notes:

Exposure to Asbestos can lead to serious illness and fatality from mesothelioma, asbestosis and lung cancer. An exposure standard exists for asbestos – being 0.1 fibres per ml of air (in a persons breathing zone averaged over 8 hours).

Prohibitions on Asbestos:
  • Unlicensed removal of under 10 sq m of ACM does not include friable asbestos
  • High pressure air or gases must not be used on or near ACM
  • High power tools must not be used (unless dust is able to be totally captured and exposure remains half of the exposure standard)
Definitions:
  • Asbestos Containing Material (ACM) means any material, object, product or debris that contains asbestos.
  • Non-Friable Asbestos means asbestos-containing material which, when dry, does not become crumbled, pulverised or reduced to powder by hand pressure. Common examples: cement sheeting, ceiling tiles, vinyl tiles.

Price: $79.95 


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Heights (Safe Working At) Safe Work Method StatementHeights (Safe Working At) Safe Work Method Statement
Heights (Safe Working At) Safe Work Method Statement
working on roofs, safe work, rooves, height safety, construction site safetyworking on roofs, safe work, rooves, height safety, construction site safety
Working On Roofs Above 2m Safe Work Procedure
Scissor Lift Safe Work Method StatementScissor Lift Safe Work Method Statement
Scissor Lift Safe Work Method Statement