Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Ceiling Installation - Suspended Grid System Safe Work Method Statement
Ceiling Installation - Suspended Grid System Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Ceiling Installation - Suspended Grid System  Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure.  

This SWMS covers general hazards associated with the installation of a basic suspended ceiling grid system with drop-in tiles. This does not cover electrical works that are required to be undertaken by a licensed electrician.

The Ceiling Installation - Suspended Grid System procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Ceiling Installation - Suspended Grid System Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Ceiling Installation - Suspended Grid System Work Method Statement includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • On Completion
  • Emergency Procedures
  • References
Product Details
  • 10 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Planning

Ensure all employees have induction card for construction sites. Liaise with Principal Contractor to ensure site-specific induction undertaken. 

Ensure grid system complies with Building Code requirements and AS/NZS 2785-2000. Take note of earthquake requirements if applicable.

Assess installation site. Check:
  • Presence of hazardous materials such as asbestos, lead, silica etc)
  • Load bearing capacity of support walls, ceiling, roof (if required to enter roof areas)
  • Height of work area
  • Access for equipment (including height access equipment) and materials
  • Power supply
  • Location of existing services (heating, water, pipes, electrical leads)
  • Vehicle access for delivery
  • Traffic Management requirements
  • Lighting requirements

Price: $79.95 


Quantity:   




Plasterboard Fixing Safe Work Method StatementPlasterboard Fixing Safe Work Method Statement
Plasterboard Fixing Safe Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Plasterboard Setting Safe Work Method StatementPlasterboard Setting Safe Work Method Statement
Plasterboard Setting Safe Work Method Statement
Job Safety Analysis WorksheetJob Safety Analysis Worksheet
Job Safety Analysis Worksheet