Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Welding- Mig/Maw Safe Work Method Statement


Welding- Mig/Maw Safe Work Method Statement

Welding- Mig/Maw Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Welding- Mig/Maw Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure. This SWMS covers MIG (Metal Inert Gas) or GMAW (Gas Metal Arc Welding) welding processes.  

Common shielding gases (inert) include Argon and in some cases helium which are used for aluminum and non-ferrous materials. Carbon dioxide (CO2) is also commonly used for welding steel. These gases can displace oxygen in the worker's breathing zone and lead to injury and in extreme cases – fatality. It is vital that sufficient ventilation is provided (particularly as most MIG welding occurs indoors to ensure shielding gas function) not just for controlling inert gas dangers, but also for contaminants that may be present in the welding plume

The Welding- Mig/Maw procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Welding- Mig/Maw Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Welding- Mig/Maw Work Method Statement includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 13 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:
Planning:

Develop and implement Hot Works Permit system. Include, at least:
  • Exact details of job
  • Exact location
  • Valid time/date
  • Permit for each day required
  • Equipment to be used
  • Fire protection equipment available
  • Responsible persons (including sign-off by suitably trained persons)
  • Work environment assessment
  • Ventilation requirements
  • Spotters (names, training etc) if required
  • Name of all workers
  • Gas testing equipment (if required)
  • All safety precautions required
  • A system to audit/monitor permits for completion.

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Grinder Safe Work Method Statementgrinding safety, hand grinder, Work Method Statement,
Grinder Safe Work Method Statement
Welding- Oxyacetylenewelder safety, welding, welding work method statement, welding SOP, welding SWP, welding standard operating procedure
Welding- Oxyacetylene Safe Work Method Statement
Cut-Off Metal Saw Safe Work Method StatementCut-Off Metal Saw Safe Work Method Statement
Cut-Off Metal Saw Safe Work Method Statement