Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
LOTO - Lock Out Tag Out Safe Work Method Statement


LOTO - Lock Out Tag Out Safe Work Method Statement

LOTO - Lock Out Tag Out Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Lock Out Tag Out -  LOTO Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure. 

This SWMS includes general guidance for Locking out and Tagging of plant and machinery to prevent plant and its components from activating (including release of stored energy) during inspection, maintenance, repair or cleaning. It also includes information for tagging plant that is in an unsafe condition.

Without procedures in place to ensure power is isolated to plant, persons can be killed or seriously injured from its accidental start-up. 

The LOTO - Lock Out Tag Out  procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The LOTO - Lock Out Tag Out Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The LOTO - Lock Out Tag Out Work Method Statement includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Emergency Procedures
  • References

Product Details:
  • 10 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Preparation

Ensure appropriate locking devices for type of plant. Examples:
  • Padlocks
  • Lockboxes
  • Lock-out hasps (non-conductive, high visibility – if required)
  • Electrical lockouts
  • Cable lockouts
  • Valve lockouts
  • Safes and key cabinets

Ensure suitable tags available:
  • Meet requirements of AS 1319-1994, examples:
  • Out of Service:
    • Yellow background with bold black text  “Out of Service” on each side
  • Personal Danger:
    • White background
    • Recognisable danger symbol on each side
    • Bold black text
  • Durable
  • 60 x 120mm
  • Reliable means of attachment

Ensure only 1 key per lock. No duplicate keys. 

Ensure ALL employees at site are trained in LOTO procedures


Price: $79.95 


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Heights (Safe Working At) Safe Work Method StatementHeights (Safe Working At) Safe Work Method Statement
Heights (Safe Working At) Safe Work Method Statement
Ladders Safe Work Method StatementLadders Safe Work Method Statement
Ladders Safe Work Procedure
Power Tools Safe Work Method StatementPower Tools Safe Work Method Statement
Power Tools