Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Concrete Grinding & Polishing for Floors Safe Work Method Statement
Concrete Grinding & Polishing for Floors Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Concrete Grinding & Polishing for Floors – (2 part Epoxy) Safe Work Method Statement (SWMS) is a comprehensive 14 page procedure.  This SWMS involves the use of a floor grinder/polisher on an indoor concrete floor using 2 Part (Part A resin and Part B hardener) Epoxy floor coating.

The Concrete Grinding & Polishing for Floors – (2 part Epoxy), procedure  is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Concrete Grinding & Polishing for Floors – (2 part Epoxy), Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Concrete Grinding & Polishing for Floors – (2 part Epoxy) Work Method Statement includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 14 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Pre-operational Inspection

Inspect equipment. Ensure:
  • Electrical lead/plug undamaged, tested/tagged and be supplied with RCD protection
  • Electrical lead not placed in areas where it may be damaged or pose a tripping hazard
  • Floor grinder:
    • Operating labels undamaged and legible
    • Handles clear of grease, oil, dirt. 
    • Head locks/shear pins are tight and secured
    • All guards/motor housing undamaged Suitable grinding wheels as instructed by manufacturer
    • Each grinding head has same diamond type, number of diamonds and height.
    • Emergency stop in place, undamaged and functional
    • Shroud undamaged and joining at front. Adjusted to ensure good seal with floor. 
    • Shroud totally encloses exhaust entry point for hose
    • Hoses undamaged and adequately secured

Price: $79.95 


Quantity:   




Concrete Sawing Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.Concrete Sawing Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.
Concrete Sawing Safe Work Procedure or Work Method Statement
Concrete Joining, Sealing and Curing Safe Work Method StatementConcrete Joining, Sealing and Curing Safe Work Method Statement
Concrete Joining, Sealing and Curing Safe Work Method Statement
Concrete Helipcopter Safe Work Method StatementConcrete Helipcopter Safe Work Method Statement
Concrete Helicopter Safe Work Method Statement
Circular Saw Safe Work Procedure (Handheld) (CLONE)Circular Saw Safe Work Procedure (Handheld) (CLONE)
Circular Saw Safe Work Procedure (Handheld)