Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Industrial Rope Access Safe Work Method Statement
Industrial Rope Access Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Industrial Rope Access Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure.  Industrial rope access systems are used for gaining access to, and working at a workface, usually by means of vertically suspended ropes (can be horizontal – such as under bridge work). Other methods of accessing a work face should be considered (for example, EWPs or building maintenance units) before rope access systems, as a high level of skill is essential for their safe use. This SWMS does NOT deal with permanent rope access structures/anchor points that will be left in place, or purpose built suspension rigs.  
The Industrial Rope Access procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Industrial Rope Access Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Industrial Rope Access Work Method Statement includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Set up & Operation
  • Emergency Rescue
  • References

Product Details:
  • 10 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery


Related items:

Preparation

Ensure suitable rope system is provided:
  • full body harness with shoulder straps
  • compatible clips, karabiners etc
  • suitable WLL
  • all components of system meet AS/NZS 4488 and are labeled as such 
  • manufacturer's  instructions are available

Ensure weather conditions have been checked prior to starting. 

Note: Conduct regular checks on weather conditions throughout duration of task.

Ensure barricades and warning/caution signs are placed under the work zone to protect the public. 

Ensure barricades/warning signs are placed in all anchor point locations to prevent tampering/disturbance. 

Ensure adequate supervision for task (eg; Level 2 or 3 certified operators may be required for deviations above the 20 degree rule).

Price: $79.95 


Quantity:   




Heights (Safe Working At) Safe Work Method StatementHeights (Safe Working At) Safe Work Method Statement
Heights (Safe Working At) Safe Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Hiab Truck Loader CraneHiab Truck Loader Crane
Hiab Truck Loader Crane Work Method Statement
Painting (General Requirements) Safe Work Method StatementPainting (General Requirements) Safe Work Method Statement
Painting (General Requirements) Safe Work Method Statement