The Tree Felling using Dozer Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure. This SWMS covers hazards associated with the use of Dozers to conduct tree felling/clearing activities.
The Tree Felling using Dozer procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Tree Felling using Dozer Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Tree Felling using Dozer Safety Procedure includes:
Product Details:
Related items:
Planning
Ensure equipment suitable for task – (know the capabilities and limitations of particular model,
Example: SWL, hp, and gradient of acceptable slopes).
Inspect intended work area. Ensure:
Price: $79.95 |






