The Road Works – Site Preparation Safe Work Method Statement (SWMS) is a comprehensive 20 page procedure. This SWMS covers general hazards associated with road works – site preparation, including: Clearing vegetation (general and for drill rigs) stripping top soil, preparation of drill pads, trenching and hot works
Equipment includes Dozers, Excavators, Graders and road vehicles. This SWMS is to be used in conjunction with Dozers – Tree Felling SWMS and SWMS specific to items of plant (Graders, Excavators etc).
The Road Works – Site Preparation procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Road Works – Site Preparation Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Road Works – Site Preparation Work Method Statement includes:
Product Details:
Related items:
Planning
Ensure Standard work plans are available for site. Include:
Ensure all permits / licenses are obtained as required.
Ensure detailed instructions provided. Example:
Price: $79.95 |
![]()
|






