Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Stairs Handrails & Balusters Safe Work Method Statement
Stairs Handrails & Balusters Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Stairs Handrails & Balusters Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure outlining the safety steps for installing stairs, handrails and balusters.  

Critical Information: Reference must be made to Material Safety Data Sheets (MSDS) or Technical Data Sheets (TDS) for information relating to specific hazards and risk control measures associated with various timbers / wood products – In particular the use of Medium Density Fibre-board (MDF).All appropriate Personal Protective Equipment (PPE) must be available, suitable and worn when carrying out work activities. All employees (including sub contractors) must comply with additional health and safety conditions imposed by the Builder / Site.  Appropriate job planning, acceptable housekeeping standards & working harmoniously with other trades (persons) is expected

The Stairs Handrails & Balusters procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Stairs Handrails & Balusters Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Stairs Handrails & Balusters Work Method Statement includes:
  • PPE
  • Safety Notes
  • Operators Requirements
  • Transporting
  • Planning & Preparation
  • Site Awareness
  • Pre-start Check
  • Installation
  • Completion
  • References

Product Details:
  • 9 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Transporting

Ensure an appropriate number of people are assigned to load vehicle to reduce manual handling risks. Ensure that materials / equipment are suitably restrained during transport to prevent damage and or load moving / being lost. Check integrity of load restraint prior to leaving site. Ensure load does not restrict view of vehicle driver.

Price: $79.95 


Quantity:   




Safety Harness Safe Work Method Statementsafety harness policy, safety harness procedure, safe harness procedure
Safety Harness Safe Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
scaffolding safety, safe work procedure work method statementscaffolding safety, safe work procedure work method statement
Scaffolding Safe Work Procedure
Glass Handling Safe Work Method StatementGlass Handling Safe Work Method Statement
Glass Handling Safe Work Method Statement