Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Carpet Cleaning Safe Work Method Statement


Carpet Cleaning Safe Work Method Statement

Carpet Cleaning Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Carpet Cleaning Safe Work Method Statement (SWMS) is a comprehensive 15 page procedure.  This SWMS concerns the task of carpet cleaning, including the use of a steam cleaner machine and spot stain removal.

The Carpet Cleaning procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Carpet Cleaning Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Carpet Cleaning Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 15 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:

Operation

Assess suitable travel pathway to enter/exit premises when carrying materials.

Check for stairs, stored items, corners or other obstructions that could cause tripping, crushing of fingers, or awkward postures when carrying equipment

Remove furniture, non-essential items and any debris from room to be cleaned. Do not handle broken glass directly. Use dust pan and brush to collect broken glass, wear gloves and dispose in safe manner.

When using team lifts, they must be co-ordinated and practiced. Ensure adequate communication and continue to check for obstacles during transport. Move slowly with shortest travel path.

If items cannot be removed, cover with plastic to avoid damage.

Ensure persons and pets are removed from area.

Vacuum carpet thoroughly.

Pre-treat stains as required. Spray directly onto carpet in close proximity to floor surface (avoid unnecessary spraying into air).

Wear hearing protection if required.

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




general cleaning, cleaning office, OHS, OH&S Procedure, cleaning safety, document, work method statement, safe work proceduregeneral cleaning, cleaning office, OHS, OH&S Procedure, cleaning safety, document, work method statement, safe work procedure
General Cleaning - Offices
Window Cleaning - Pole & Detergent Safe Work Method Statement
Window Cleaning - Pole & Detergent Safe Work Method Statement
Cleaning - general Safe Work Method Statement
Cleaning - general Safe Work Method Statement
sharps disposal, needle injury, handling needles, work method statementsharps disposal, needle injury, handling needles, work method statement
Sharps Disposal SWP