The Pool Construction – in ground, Safe Work Method Statement (SWMS) is a comprehensive 21 page procedure.
This SWMS covers general hazards associated with installation of in-ground swimming pools. This SWMS should be used in conjunction with SWMS dedicated to Trenching operations, Confined Space Entry (as required), Concrete Pumping /Mixing etc, Use of Excavator, Hiab Crane Truck and other plant and equipment. The Pool Construction – in ground procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. The Pool Construction – in ground Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications. The Pool Construction – in ground Safety Procedure includes:
Product Details
Related items: Planning Obtain information about:
Seek geotechnical analysis as required. Notify relevant State Authority as required. Example: If persons are to enter trench, notify 3 days prior to excavation. Seek qualified persons advice (engineer) if:
Seek building permits with local authority. Select appropriate placement for pool. Consider:
Price: $79.95 |
![]()
|