The Carpentry Fit-off Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure. This SWMS covers carpentry fit-off tasks, such as attaching skirting, door handles and hanging doors etc. It does not include housing framework and other more in-depth carpentry tasks.
The Carpentry Fit-off procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Carpentry Fit-off Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Carpentry Fit-off Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational Inspection
- Operation
- Maintenance
- Emergency Procedures
- References
Product Details:
- 10 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Related items:
Pre-operational Inspection
Ensure:
- PPE supplied as needed and in good condition
- Tools are visually inspected for any damage
- Free of oil, grease, debris vents; filters etc clear and free of dust/debris
- Outside casing not damaged
- Fans and cooling devices functional
- Attachments secured and suitable for tool
- Tools are not modified
- Locking pins in place
- No loose or missing screws, nuts, bolts
- Blades sharp, chains tights
- Guards prevent access to danger areas
- Locking devices functional
- Triggers do not stick or faulty
- Dust filters in place and clean
- Wood dust collection bags in place
- Battery charging areas well ventilated
- Batteries fully charged
- Emergency stops and safety devices tested and functional
- No air/fluid leaks
- Locking pins, modifications, additions and attachments are approved by the manufacturer.
If tool is damaged, do not use. Take out of service, apply Lock-out/tag-out (LOTO) procedures and inform supervisor immediately.