The Pool Construction- above ground Safe Work Method Statement (SWMS) is
a comprehensive 15 page procedure. This SWMS covers the installation
of an above ground pool. This includes several safety considerations,
however the pool manufacturer’s instructions must be strictly followed
and site-specific SWMS developed as needed.
The Pool Construction- above ground procedure is ready to use and is not
a blank template. Simply add your company details, ABN, and include any
site specific details or risks and make it specific to the task at
hand. It is then ready for printing and to be incorporated as part of
your overall OHS System.
The Pool Construction- above ground Work Method Statement can be used as
part of your OHS inductions, for Tool box talks or tender applications.
The Pool Construction- above ground Safe Work Method Statement includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational Inspection
- Transport of Equipment
- Operation
- Maintenance
- Emergency Procedures
- References
Product Details:
- 15 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Related items:
Preparation
Select appropriate placement for pool. Consider:
- Fencing
- Property lines
- Proximity to buildings/structures
- Trees and root systems
- Overhead obstructions (trees, power lines etc)
- Accessibility of excavator to area
- Local permit / Code requirements
- Underground utilities
- Septic tank/ leaching fields
- Design specifications as required
- Lay of land and any excavation required
Provide:
- Induction for all workers
- Sufficient lighting
- Suitable amenities
- Communication equipment
- First Aid supplies and trained first aiders
For turf cutters. Ensure:
- Adequate lighting (daylight only)
- Electric models not used in inclement weather
- Operator not fatigued or under influence of drugs/alcohol
- Hair tied back, no loose clothing or jewellery
- Operator able to handle force/weight of unit
- Operating manual available
- Area clear of hazardous materials (wire, tree roots etc)