Gas Installation Safe Work Method Statement


Gas Installation Safe Work Method Statement

Gas Installation Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Gas Installation Safe Work Method Statement (SWMS) is a comprehensive 14 page procedure.  This SWMS covers general safety aspects associated with installing gas to premises. This DOES NOT include installations to complex sites or Class B appliances that require submission of a safety case and further approvals. 

This document DOES NOT include detailed instructions on how to install the service as this work should only be carried out by licensed professionals, it varies considerably at each site and rules governing the process is legislated by each State. A site/task-specific SWMS should be developed as needed. 

The Gas Installation procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Gas Installation Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Gas Installation Safety Procedure includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Transport of Equipment
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 14 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:


Planning

Obtain authority and approval from Gas supplier prior to works being conducted. 

Liaise with Principal Contractor. Ensure following is provided before work commences:
  • Site specific induction (include location of amenities, first aid facilities, emergency plans and evacuation points, incident reporting, communication, contact persons etc)
  • Health and Safety Rules for site
  • Supervisory arrangements
  • PPE requirements for site (hard hat, high visibility clothing, safety boots, etc)
  • Types of hazards at site
  • Site plans – showing no go zones for pedestrians
  • Traffic Management plans
  • Relevant SWMS and JSA's
  • Site security requirements

Ensure all persons entering construction site have a Construction Induction Card (or equivalent). 

Ensure all persons undertaking gas fitting are licensed / certified gas fitters / plumbers. 

Assess risks associated with task. Consider:
  • Ventilation requirements
  • Quantity of gas that could potentially be released
  • Specific gravity and pressure in system
  • Time worker will spend in gas atmosphere
  • Sources of ignition.

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Plumbing Fit-off Safe Work Method Statement
Plumbing Fit-off Safe Work Method Statement
Plumbing Hot & Cold Water Rough In Safe Work Method StatementPlumbing Hot & Cold Water Rough In Safe Work Method Statement
Plumbing Hot & Cold Water Rough In Safe Work Method Statement
Suspended Sanitary Waste Safe Work Method StatementSuspended Sanitary Waste Safe Work Method Statement
Suspended Sanitary Waste Safe Work Method Statement
working on roofs, safe work, rooves, height safety, construction site safetyworking on roofs, safe work, rooves, height safety, construction site safety
Working On Roofs Above 2m Safe Work Procedure