The Roofing - Zincalume/Colorbond Safe Work Method Statement (SWMS) is a
comprehensive 19 page procedure. This SWMS covers general safety
aspects associated with the installation & repair of Colorbond and
Zincalume steel sheeting. It does NOT contain detailed information in
relation to plant and equipment (such as Truck mounted cranes,
Forklifts, Ladders, Scaffolding, Metal cutters, etc) as these require a
dedicated SWMS.
The Roofing - Zincalume/Colorbond Work Method Statement (WMS) is ready
to use and is not a blank template. Simply add your company details,
ABN, and include any site specific details or risks and make it specific
to the task at hand. It is then ready for printing and to be
incorporated as part of your overall OHS System.
The Roofing - Zincalume/Colorbond Work Method Statement can be used as
part of your OHS inductions, for Tool box talks or tender applications.
The Roofing - Zincalume/Colorbond SWMS includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Pre-operational Inspection
- Operation
- Maintenance
- Emergency Procedures
- References
Product Details:
- 19 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Related items:
Planning:
Liaise with Principal Contractor. Ensure following is provided before work commences:
- Site specific induction (include location of amenities, first aid
facilities, emergency plans and evacuation points, incident reporting,
communication, contact persons etc)
- Health and Safety Rules for site
- Supervisory arrangements
- PPE requirements for site
- Types of hazards at site
- Site plans – showing no go zones for pedestrians
- Traffic Management plans
- Relevant SWMS and JSAs
- Site security requirements
Ensure all persons entering construction site have a Construction Induction Card (or equivalent).
Assess site. Ensure:
- Sufficient room for forklifts, scaffolds, crane, plant etc
- Ground surface is suitable for placement and operation of
plant/equipment - compacted, firm, clear of trenches, pits, recently
back-filled dirt (seek geological reports)
- Sufficient lighting
- Suitable weather conditions (no extreme temperatures, rain or winds)
- Hazards such as plumbing pipes etc are marked.
- Clear of hazardous works (eg: asbestos removal)
- Check for incomplete works (plumbing, electrical etc)