Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Carpet Tiles Safe Work Method Statement
Carpet Tiles Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Carpet Tiles Safe Work Method Statement (SWMS) is a comprehensive 13 page procedure. This SWMS covers installation of carpet tiles in new and existing premises. Tiles include backed/un-backed, fixed/unfixed, wool, synthetic and combination fibres, pile, needle-punch, tufted, woven etc.  Also includes self-adhesive tiles and application of carpet adhesive for tiles without self-adhesive backing. 

The Carpet Tiles Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Carpet Tiles Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Carpet Tiles SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 13 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:


Preparation:

Inspect work area. Ensure:
  • No tripping hazards
  • Clear of hazardous works in close proximity – especially hot works (grinding, welding etc)
  • Sufficient lighting
  • Adequate ventilation (use mechanical extraction if required)
  • Clear of non-essential persons (barricades and signage in place as required)
  • Clear of ignition sources if adhesive flammable

Note: Ignition sources include pilot lights, stoves, heaters, cigarettes, matches/lighters, grinding, welding, power points, lighting, light switches, radio transmitters, mobile phones, battery powered forklifts etc.

Storing Adhesive:
  • Ensure packages are stored within manufacturer’s recommendations 
  • Polyethylene container (as provided by manufacturer)
  • Ensure adequate spill containment is provided (eg bunded pallets for packages if required) 
  • Store in a cool, well ventilated area
  • Store away from ignition sources
  • Store clear of incompatibles and food stuffs
  • Check containers regularly for leaks

Ensure spill containment kit available at site. Include:
  • Impervious gloves and safety goggles
  • Trowel, scraper and access to plenty of water

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Carpet Laying Procedure, safety procedure, safe work method statement, SWP, SWMSCarpet Laying Procedure, safety procedure, safe work method statement, SWP, SWMS
Carpet Laying Safe Work Procedure
Vinyl Flooring - laying Safe Work Method Statement
Vinyl Flooring - Laying Safe Work Method Statement
Vinyl Tiles - Laying Safe Work Method Statement
Vinyl Tiles - Laying Safe Work Method Statement
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement