Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Electrical Fit-off Safe Work Method Statement
Electrical Fit-off Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Electrical Fit-off Safe Work Method Statement (SWMS) is a comprehensive 14 page procedure. This SWMS involves electrical fit-off conducted in new dwellings under construction. This does NOT involve working with live high voltage assets.

The Electrical Fit-off Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Electrical Fit-off Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Electrical Fit-off SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 14 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:


Pre-operational Inspection:

Inspect all equipment before use. Examples:

Power tools:
  • Tools are visually inspected for any damage
  • Vents; filters etc clear and free of dust/debris
  • Outside casing not damaged
  • Fans and cooling devices functional
  • No loose or missing screws, nuts, bolts
  • Guards prevent access to danger areas
  • Triggers do not stick or are faulty
  • Battery charging areas well ventilated
  • Batteries fully charged
  • Emergency stops and safety devices tested and functional

Electrical:
  • RCDs installed 
  • Ensure leads/plugs are not damaged 
  • Use pendants, lead-stands or insulated cable hangers for leads
  • Ensure all equipment and leads are tested and tagged as required for use. 
  • Do not use electrical equipment in wet or damp areas or in inclement weather.

PPE:
  • Suitable for task
  • Clean, undamaged and maintained.

If equipment is damaged, do not use. Take out of service, apply Lock-out/tag-out, (LOTO) procedures and inform supervisor immediately.

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Electrical Wiring Low Voltage Safe Work Method StatementElectrical Wiring Low Voltage Safe Work Method Statement
Electrical Wiring Low Voltage Safe Work Method Statement
Ladders Safe Work Method StatementLadders Safe Work Method Statement
Ladders Safe Work Procedure
Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Job Safety Analysis WorksheetJob Safety Analysis Worksheet
Job Safety Analysis Worksheet