Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Hand Tools Safe Work Method Statement
Hand Tools Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Hand Tools Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure. This SWMS covers use of common non-powered hand tools, such as hammers, chisels, screwdrivers, pliers, wrenches and cutting tools such as saws, knives, axes etc.

The Hand Tools Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Hand Tools Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Hand Tools SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Product Details:
  • 11 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:


Planning:

Assess task.  Consider use of power tools for repetitive or high force tasks wherever possible.

Develop purchasing procedure to ensure quality tools provided. Example:
  • Forged steel 
  • Handles ergonomic:
    • Cylindrical, approximately 4cm in diameter
    • Non-slip, good grip
    • No sharp edges
    • Wrist can be held straight
    • Guards or stoppers
    • Majority of tool weight not supported at wrist
  • Suitable for environment:
    • Insulated for electrical work (ensure blade does not extend into handle).
    • Non-sparking if used in flammable zones     
  • Suitable strength and capacity for intended tasks 

Ensure all PPE required is in good working order. Note: If hearing protection is required, ensure the protection factor is not so high that reversing alarms etc cannot be heard.

Ensure workers have access to:
  • First aid kit/supplies
  • Communication devices (check mobile phones will have service in area)
  • Drinking water and other amenities

Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Manual Handling - Lifting Safe Work Method StatementManual Handling - Lifting Safe Work Method Statement
Manual Handling - Lifting Safe Work Method Statement
Ladders Safe Work Method StatementLadders Safe Work Method Statement
Ladders Safe Work Procedure
Heights (Safe Working At) Safe Work Method StatementHeights (Safe Working At) Safe Work Method Statement
Heights (Safe Working At) Safe Work Method Statement
Power Tools Safe Work Method StatementPower Tools Safe Work Method Statement
Power Tools