![]() |
The Confined Space Rescue Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure.
This SWMS covers general aspects of rescue operations in confined spaces. It does not provide detailed instructions for rescue as these differ in each circumstance. Ensure that a site and task specific SWMS is developed to include emergency procedures applicable to the confined space where work will be conducted
The Confined Space Rescue Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Confined Space Rescue Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Confined Space Rescue SWMS includes:
Product Details
Related items:
Planning:
Ensure no persons working in Confined Space without Confined Space Entry Permit.
Assess site. Determine:
Determine the type of emergency that could occur based on the type of confined space. Example:
Price: $79.95 |
![]()
|





