Safety Culture
 Email Us  1300 306 604
OHS Systems Work Method
Statements
Environmental OHS Audits Safety Shop OHS News
Language:
Currency:
VAT Mode:
Concrete Construction activities at a Petrol Station Safe Work Method Statement
Concrete Construction activities at a Petrol Station Safe Work Method Statement

E-mail this product to a friend E-mail this product to a friend


Previous  Up  Next" 

The Concrete Construction activities at a Petrol Station Safe Work Method Statement (SWMS) is a comprehensive 21 page procedure. This SWMS covers the excavation (cutting, drilling) of existing concrete flooring and installation of new concrete floors at petrol stations or areas where flammable atmospheres may be present. 

This involves outdoor work at ground level. Ensure specific SWMS are developed for use of equipment such as excavators, bobcats, wacker-packer, power saws, petrol powered trowel, formwork, tying rebar and concrete pumping as required.

The Concrete Construction activities at a Petrol Station, Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System. 

The Concrete Construction activities at a Petrol Station, Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

The Concrete Construction activities at a Petrol Station, SWMS includes:
  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Cleaning & Maintenance
  • Emergency Procedures
  • References
Product Details:
  • 21 Page procedure
  • Written by ex WHS inspectors
  • Referenced 
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related items:


Planning:

Liaise with client (petrol station management) to ensure:
  • Hazardous zones are identified 
  • All service station pumps and equipment are shut down and locked so they cannot be restarted.
  • All storages of LPG, fuel and associated gauges and pipe-work are barricaded and protected from damage
  • Site induction is provided (location of clean-up/toileting facilities, no go zones, smoking or mobile phone use areas and nature of flammable hazards No ignition sources or work producing ignition sources to be undertaken within 3m of flammable storages (liquids or gas)
  • Equipment for monitoring flammable vapour in work area available. 

Ensure no work is conducted in Zone 1 (highly flammable hazardous areas) with plant or equipment that is not rated for an explosive atmosphere. Check all equipment for required markings as per AS 2380.4. 

Develop site specific SWMS. Include:
  • Work to be conducted
  • Assessment of risks at site
  • Location of underground tanks and assets
  • Fire protection equipment
  • Emergency procedures- including fire response
  • Spills or accidental release of LPG
  • Traffic management requirements
  • Communication devices

Specific training and equipment for working in hazardous or flammable areas


Price: $79.95 


This product qualifies for quantity discount pricing.

(what's this?)


Quantity:   




Concrete Preparation and Laying Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.Concrete Preparation and Laying Safe Work Procedure Or Work Method Statement. Ready For Download. Available now. Largest Online Safety Library.
Concrete Preparation and Laying Safe Work Procedure or Work Method Statement
Cornice Fixing Safe Work Method StatementCornice Fixing Safe Work Method Statement
Cornice Fixing Safe Work Method Statement
Cleaning Stainless Steel Welds Safe Work ProcedureCleaning Stainless Steel Welds Safe Work Procedure
Cleaning Stainless Steel Welds Safe Work Procedure
Cherry Picker (Elevated Work Platform) Safe Work Method StatementCherry Picker (Elevated Work Platform) Safe Work Method Statement
Cherry Picker (Elevated Work Platform) Safe Work Method Statement