![]() |
The Petrol powered Generator - Portable Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure. This SWMS covers general aspects associated with portable petrol-powered generators.
The Generator - Portable Petrol Powered Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Generator - Portable Petrol Powered Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Petrol Powered Portable Generator SWMS includes:
Product Details:
Related items:
Preparation:
Ensure location is suitable for generator.
Note: Ignition sources include pilot lights, stoves, heaters, cigarettes, matches/lighters, grinding, welding, power points, lighting, light switches, radio transmitters, mobile phones, battery powered forklifts etc.
Ensure all devices/appliances are suitable to use with generator.
Dry (if appliances have been wet – allow to dry and ensure tested by licensed electrician before use)
Correct wattage for generator
Ensure operating manual is available onsite. Ensure all operators are aware of how to shut-down unit in an emergency.
Price: $79.95 |
![]()
|





