Caulking Grouting Patching Safe Work Method Statement
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Caulking Grouting Patching Safe Work Method Statement
This Caulking/Grouting/Patching Safe Work Method Statement (SWMS) covers hazards and controls associated with caulking, grouting and patching of concrete pre cast panels, block/brick work, concrete paving tiles and other building components.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Job Steps Covered in Caulking Grouting Patching SWMS:
(includes potential hazards and control measures)
- Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
- Working Near Unprotected Edges
- Mixing & Applying Grouts & Patching Products
- On Completion
- Emergency Response
We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Caulking Grouting Patching Safe Work Method Statement
This Caulking/Grouting/Patching Safe Work Method Statement (SWMS) covers hazards and controls associated with caulking, grouting and patching of concrete pre cast panels, block/brick work, concrete paving tiles and other building components.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Involves a risk of a person falling from 2m or more, including work on telecommunications towers
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Job Steps Covered in Caulking Grouting Patching SWMS:
(includes potential hazards and control measures)
- Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
- Working Near Unprotected Edges
- Mixing & Applying Grouts & Patching Products
- On Completion
- Emergency Response
We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.