Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Road sign next to highway in a remote area.

Remote Areas Driving Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian and New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Remote Areas Driving Safe Work Method Statement

This Remote Areas Driving Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of a 4WD vehicle in remote areas.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips and Falls, Hazardous Substances, Hazardous Manual Tasks and Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Remote Areas Driving SWMS:

(includes potential hazards and control measures)

  1. Implement Remote and Isolated Work Plan
  2. Training
  3. Assess Travel Conditions
  4. Vehicle Operation (travel)
  5. Environment
  6. Bushfires
  7. Crossing Rivers & Creeks
  8. Driving in Sand/Mud
  9. Vehicle Recovery Operations
  10. Accidents/Breakdowns
  11. Repairs (i.e. tyre changes)
  12. Contact with Insects and Reptiles
  13. Fuelling On-site
  14. On Completion
  15. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian and New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Remote Areas Driving Safe Work Method Statement

This Remote Areas Driving Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of a 4WD vehicle in remote areas.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips and Falls, Hazardous Substances, Hazardous Manual Tasks and Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Remote Areas Driving SWMS:

(includes potential hazards and control measures)

  1. Implement Remote and Isolated Work Plan
  2. Training
  3. Assess Travel Conditions
  4. Vehicle Operation (travel)
  5. Environment
  6. Bushfires
  7. Crossing Rivers & Creeks
  8. Driving in Sand/Mud
  9. Vehicle Recovery Operations
  10. Accidents/Breakdowns
  11. Repairs (i.e. tyre changes)
  12. Contact with Insects and Reptiles
  13. Fuelling On-site
  14. On Completion
  15. Emergency Response

 

We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

PDF Download
PDF File

Hear From Our Customers

  • 5

    Documentation thorough and well done.

    Excellent documentation covering water crossings, wheel changing and major vehicle recovery options.

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View