Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Orange and black portable generator sitting on the ground outside.

Generator Portable Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Generator Portable Safe Work Method Statement

This Generator Portable Safe Work Method Statement (SWMS) covers hazards and controls associated with portable unleaded petrol or diesel powered generators.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Generator Portable SWMS:

(includes potential hazards and control measures)

  1. Transporting the Generator To/From Sites
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Hazardous Substance/Chemical Use
  6. Generator Operation
  7. Re-fuelling On-site
  8. On Completion
  9. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Generator Portable Safe Work Method Statement

This Generator Portable Safe Work Method Statement (SWMS) covers hazards and controls associated with portable unleaded petrol or diesel powered generators.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Generator Portable SWMS:

(includes potential hazards and control measures)

  1. Transporting the Generator To/From Sites
  2. Arrival On-site & Assess On-site Conditions
  3. Work Area Set-up
  4. Environment
  5. Hazardous Substance/Chemical Use
  6. Generator Operation
  7. Re-fuelling On-site
  8. On Completion
  9. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View