Loading... Please wait...

Heat Stress SWMS

Heat Stress SWMS

Heat Stress SWMS Video

Other Details

PDF Download:
Heat_Stress_Work_Statement_Method_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 9 July 2014

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with heat stress.

Employees can suffer illness from working in excessively hot environments (such as foundries, iron works etc). Heat is not based on air temperature alone, heat sources can come from high temperatures, radiant heat, high humidity, hot objects, or strenuous physical activity.

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
Write your own product review

Product Reviews


  1. Spruce Clean Pty Ltd

    Posted by on

    Dealing with Australia's ever changing weather, Heat Stress SWMS is a must have SWMS to all businesses operating outdoors, as well as in conditions where heat is a factor.


  2. Heatwave SWMS

    Posted by on

    The SMWS gives good information for those looking for more details into Heat management and ways to work around heat scenarios. So easy to work with and make changes to it as you need to keep up the good work.


    --------------------------------------------------------------------------------


  3. Heat Stress SWMS

    Posted by on

    This free product was a good one for our clients as it is something that they can develop into their own document without it appearing that we are pushing our company OHS onto them thus allowing them to manage their employees better when hot weather strikes.


  4. Not Bad

    Posted by on

    I found it had relevant information but still needed some tweaking, but overall found it reasonably good. Some good nformation and clearly well thought through.


  5. Heatwave SWMS

    Posted by on

    This SMWS gives good information and references for those looking for more details into Heat management and ways to work around heat scenarios


  6. Heat Stress SWMS

    Posted by on

    The Safety Culture template provided a sound basis on which to develop OFSC compliant SWMS with not too much tweaking to bring it up to standard.


  7. heatwave

    Posted by on

    Very informative and helpful in an area that directly affects my business, a small fabrication workshop that regulary sees temperatures above 35 degrees in summer.


  8. Thanks...

    Posted by on

    What a great Idea to offer the SWMS - Heat Stress as a give away, especially as our days are getting hotter, and a SWMS that some of us would have overlooked; but very necessary. Kerp up the great work guys...


  9. Hot planet

    Posted by on

    with the current heat wave most of Australia is experiencing the SWMS heat stress came out just in time for our staff to be warned of the risks involved while working outdoors in heat wave conditions. Being aware of the symptons will avert any long term or disatrous consequences of working outdoors in the hot weather conditions.


$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES
Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST