Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Manual Handling SWMS + JSA Starter Pack

Manual Handling SWMS + JSA Starter Pack

Product SKU: 50134
Manual Handling SWMS + JSA Starter Pack Video

Other Details

PDF Download:
Start_Safe_KitA_Sample.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
  • Provides a framework for training workers
  • Written by ex WHS inspectors
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
  • Includes a:
    • Manual Handling Safe Work Method Statement
    • Job Safety Analysis (JSA)

Including a Safe Work Method Statement and Job Safety Analysis Form this starter pack is an ideal starting point for businesses who are:

  • working towards reaching Workplace Health & Safety compliance and/or
  • meeting the requirements set out by Principal contractors. 

 

Safe Work Method Statement

The Manual Handling Safe Work Method Statement (SWMS) covers the requirement to identify, assess and control manual handling risks in the workplace. A SWMS provides written proof that safety training for Manual Handling has taken place. 

SWMS includes

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • ReviewReferences
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

 

Job Safety Analysis (JSA)

A JSA worksheet is a tool that should be used daily to identify specific hazards present on site.

Undertaking a JSA enables those involved in the work task / activity to identify hazards that may be present and establish safety control measures (preventative measures) to precent harm to life, health, property or the environment. 

A JSA Worksheet assists in assessing the risks of doing a job. A Job Safety Analysis should be completed upon arrival on site with the purpose of identifying site-specific hazards present on the day.

Basic steps to follow when completing your JSA:

  • List the job steps that are involved in the activity
  • Identify any potential hazards in each job step and write these down next to each task
  • Determine the risk level for each hazard using the Risk Assessment Matrix
  • Document control measures by pinpointing solutions that either eliminate or minimise the risk of injury for each hazard identified
  • Monitor and re-assess

Don't forget

  • To include all employees involved in the activity when completing the JSA
  • Train all persons involved in the activity to ensure they are aware of the hazards
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$89.90

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...