Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Pest Management - Bird Proofing SWMS

Pest Management - Bird Proofing SWMS

Product SKU: 10284
Pest Management - Bird Proofing SWMS Video

Other Details

PDF Download:
Pest_Management_BirdProofing_SWMS_SAMPLE_2015.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
    • Complies with current legislation in all States and Territories
    • Instant Download delivered via email
    • MS Word format for easy customisation/editing
    • Downloading and Customising Instructions provided
    • Assists with compliance requirements for WHS inspections
    • Review Date: 26 March 2015

The Pest Management - Bird Proofing Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls for bird proofing.

This SWMS covers the requirement to identify, assess and control hazardous manual tasks specific to the installation of materials to bird proof buildings. This SWMS covers general hazards and risks associated with works being conducted in the presence of overhead electric lines and in close proximity to railway tracks.

This SWMS includes:

  • PPE
  • Safety Notes
    • Arrival & Sign in on site
    • Noise
    • Work near Overhead Power Lines
    • Work near Railway lines / Rail Corridor
  • Site Setup
  • Pre - Start Check
  • Working at Heights
  • Cleaning & Preparation - areas where bird proofing is to be installed
  • Installing Bird Netting
  • Installing Bird Spikes
  • Installing Electric Bird Track
  • Re-fuelling compressor
  • Pack up, Sign out and leave site
  • Maintenance
  • Emergency Procedures
  • Review
  • References 
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

Written by ex WHS inspectors Easy customisation with MS Word format (NOT PDF) Risk ratings before and after control measures Provides a framework for training workers Can be used as part of tender applications, WHS inductions, and Toolbox talks

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...