Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete Slab (On Ground) SWMS Pack 10

Concrete Slab (On Ground) SWMS Pack 10

Product SKU: 50153
Concrete Slab (On Ground) SWMS Pack 10 Video

Other Details

PDF Download:
Saw_circular_SWMS_10.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Contains 8 Ready to Use Safe Work Method Statements
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • You must have Microsoft Word or iAuditor to use this template

Concrete Slab (on ground) Safe Work Method Statement Pack

This Safe Work Method Statement (SWMS) pack contains 8 SWMS in total. Each SWMS contained within the Concrete Slab (On Ground) Safe Work pack includes a comprehensive outline of the job steps, main hazards and controls associated with commercial concreting works for on ground slabs.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

The eight (8) SWMS included in this pack are: 

All SWMS in the Concrete Slab (on ground) pack address: 

  • High Risk Construction Work
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps
  • Potential Hazards
  • Control Measures
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring

swmsformats.png

     

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at. or works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

RRP:
$639.60
$440.00

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...