Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Asphalt Hot Mix Work Method Statement
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Ashpalt Hot Mix Work Method Statement or Safe Work Procedure



Steel Construction SWMS
Buy Now

 

The Asphalt Hot Mix Safety Procedure includes :

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Loading
  • Transport
  • Operation
  • First Aid and Emergency Procedures
  • 8 page procedure
  • Microsoft Word Format
  • Add site specific details and risks
  • Make it task specific
  • E-mailed out

 

Download a sample of the Asphalt Hot Mix Work Method Statement.

 

Asphalt Hot Mix Safe Work Method Statement:

The Hot Asphalt Mix Safe Work Method Statement (SWMS) is a comprehensive 8 page procedure

This SWMS covers application of hot asphalt mix (between 140-200 degrees Celsius) to roads for smaller sized tasks (using a Flocon /truck of 8T capacity). It does not include major highway sealing works or roof spaying.

The Asphalt-hot mix procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Hot Asphalt Mix procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.

First Aid and Emergency procedures

Asphalt fumes:

  • move victim to fresh air
  • Seek medical assistance immediately

Cold asphalt:

  • remove from skin with hand cleaner
  • wash skin with soap and water
  • remove contaminated clothing
  • flush eyes for at least 15 minutes

Hot asphalt:

  • apply cold water or ice pack to skin burns
  • If burns cover more than 10% of body, apply lukewarm water to alleviate pain (but heat in asphalt has to be removed).
  • Do not remove from skin
  • Do not bandage

Seek immediate medical assistance

Related items:

Manual Handling




OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012