On Completion:
Ensure that no electrical appliances, light fittings, cables etc have been damaged during installation.
If damage suspected, do not turn power back on – seek advice from licensed electrician.
Use a vacuum to clean debris and ensure larger cut-offs are removed from area.
Site to be left in clean and tidy condition.
Product Details:
- 9 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
-
Instant download delivery
Download a sample of the Audio Visual Equipment Installation Work Method Statement.

|
Audio Visual Equipment Installation Information:
The Audio Visual Equipment Installation Safe Work Method Statement (SWMS) is a comprehensive 9 page procedure outlining the safety steps for installing audio visual equipment.
This SWMS covers risks associated with installation of audio visual equipment. Ensure the manufacturer’s installation manual/guide is available for specific information on all installation works.
The Audio Visual Equipment Installation procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Audio Visual Equipment Installation Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
References:
- OHS Legislation in all States
- AS/NZS 3000 – 2007 – Wiring Rules
- WorkSafe Victoria 2005 - Basic Steps to Preventing Falls from Heights
- WorkSafe Victoria 2005 – Prevention of falls – Working on roofs
- Exact Power (middle Atlantic Products), 2009 - Power Distribution and Grounding in Residential AV Installations.
- ACT Code of Practice for Working on Roofs – Parts 1 & 2
- NSW Code of Practice Working on Roofs – Commercial
- NSW Code of Practice Working on Roofs - Residential
|