The Safety Procedure includes:
- Personal Protective Equipment (PPE)
- Pre-Start Checks
- Refuelling
- Safe Operation
- Preventing Injuries
- Correct Head Selection
- Job Completion
- Risk Ratings
Product Details:
- 11 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
Download a sample of the Brush Cutter Work Method Statement.

|
General Brush Cutter Safety Information:
The Brush Cutter Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure outlining the safety steps for use of a Brush Cutter.
The Brush Cutter procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Brush Cutter procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
General Safety During Operation:
- Ensure a safe working distance from other personnel. (Flying objects.)
- Operate at full speed.
- Use leg muscles to move the brush cutter rather than twisting.
- Never leave the brush cutter running unattended
|