Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
nav spacer
Work Method Statements
Work Method Statements spacer
Safety Culture >> Work Method Statements >> Earth Moving >> Carpet Laying Work Method Statement
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Engineering
1
1 Concrete Safety
1
Earth Moving
Auger Operation
1
Backhoe or Front End Loader
1
Battery Charging
1
1 1 Bob Cat & Skid Steer
1
1 1 Chain Trencher
1
Demolition Work
1
1 1 Dozer Operations
1
1
1 1 Earth Moving Equipment Maintenance
1
1 1 Fuel Storage, Handling and Decanting
1
1 1 Grader
1
1 1 Heat Stress
1
1 1 Hitching Mobile Plant
1
1 1 Incident Report Form
1
1 1 Jack Hammer
1
1 1 Job Safety Analysis Worksheet
1
1 1 Large Excavators
1
1 1 Lock-Out Of Plant And Equipment
1
1 1 Manual Handling
1
1 1 Mini Excavators
1
1 1 Motor Grader Operation
1
1 1 Post Hole Digger
1
1 1 Pressure Cleaner
1
1 1 Ride On Drum Roller
1
1 1 Scraper
1
1 1 Tipping Trucks
1
1 1 Traffic Management Plan
1
1 1 Trench Work
1
1 1 Underground Cable Locating
1
1 1 Vehicle Accident Procedure
1
1 1 Wacker Packer
1
1 1 Water Truck
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Industrial Safety
1
1 Electricians
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Carpet Laying Work Method Statement or Safe Work Procedure


rpet Laying

Carpet Laying SWMS
Buy Now

 

The Safety Procedure includes:

  • Risk Assessment
  • Site Awareness
  • Pre-Start Checks
  • Hand Tools
  • Operators Requirements
  • Installation
  • Personal Protective Equipment
  • Carrying Carpet
  • And much more
  • Risk Ratings
  • 7 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

 

 

General Carpet Laying Safety Information:

Carpet Laying needs to be performed in a safe manner, many injuries have resulted from unsafe practises by carpet layers.

This 7 page Safe Work Procedure or Work Method Statement can be used as part of an Induction Process and implemented into an existing OHS System.

Carpet Laying Safety Notes:

Airing the rooms after carpet has been laid is recommended. Any volatile organic compounds caught in the carpet during manufacture will dissipate within a few days.
Carpet laying can be hard on both your knees and your back. Correct manual handling and frequent stretching should be observed.

Existing damage:
   Identify and document any damage to the building or contents to prevent future conflict. Digital cameras are ideal for this task.


References:

 

 

Western Australia - Get Access Now – Department of Education and Training.
United States of America - The Carpet and Rug Institute – STANDARD for INSTALLATION of RESIDENTIAL CARPET - CRI 105 - 2002
Australia - Stainmaster Carpets – Glossary.

Miscellaneous items:
Roberts Australia – Tips for making perfect carpet seams.
The Family Handyman – June 2004 – How to Re-stretch a Carpet.

 

 

Product Updates: First Name * Last Name * Email *

OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES