The Safety Procedure includes:
- Personal Protective Equipment (PPE)
- Risk Assessment
- Pre-Start Checks
- Starting Procedure
- Refuelling
- Chain Saw Operation
- Job Completion and more
- Risk Ratings
Product Details:
- 12 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
|
General Chainsaw Safety Information:
The Chain Saw Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure outlining the safety steps for use of a Chain Saw.
The Chain Saw procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Chain Saw procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
Chainsaw Safety Notes:
- At least 2 personnel must be on site when a chainsaws is in use.
- When operating chainsaw, be aware of the stress of the item being cut.
- Pinching may result on compression side & sudden break may result on tension side.
- Do not use any faulty equipment
|