|
Concrete- Waffle Pod Information:
The Concrete- Waffle Pod Safe Work Method Statement (SWMS) is a comprehensive 16 page procedure. This SWMS covers general aspects associated with handling, delivery and placement of wet concrete being placed into a waffle pod raft system.
This does not include suspended slabs, tilt-up/ pre-form slabs, formwork, work at heights or use of machinery associated with concrete delivery in sufficient detail. A dedicated SWMS must be developed for these tasks as appropriate.
The Waffle Pod / Raft Slab concrete pour - Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Concrete- Waffle Pod Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
|