The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Operation
- Completion
- First Aid/Emergency Procedures
Product Details:
- 12 Page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
- Employee sign off section
- Instant download delivery
|
Concrete Joining, Sealing and Curing Safe Work Method Statement:
The Concrete Joining, Sealing and Curing Safe Work Method Statement (SWMS) is a comprehensive 12 page procedure outlining the safety steps for joining, sealing and curing concrete.
The Concrete Joining, Sealing and Curing procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand.
It is then ready for printing and to be incorporated as part of your overall OHS System. The Concrete Joining, Sealing and Curing procedure can be used as part of your OHS inductions, for Tool box talks or tender applications.
First Aid/Emergency Procedures :
Follow MSDS for First Aid instructions. If operator exposed, take MSDS with patient to Doctor.
Develop and implement an emergency response plan for the site. Include
- Assembly points
- Communication
- Responsible persons
- Emergency contacts (including nearest medical facility)
|