|
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Preparation
- Concrete Delivery
- Operation
- Line Cleaning
- Pump Cleaning
- Maintenance
Line Cleaning - Ensure:
- Unessential persons removed from area, especially discharge
end
- All persons to wear required PPE
- High pressure water (not air) is used
- Air-relief valves are present and working
- Relieve pressure before dismantling
- Don't leave unattended until internal pressure is gone
- Remove rubber hose at end and secure all parts to prevent
accidental movement
- Suitable catchment device/receptacle (such as concrete truck
bowl) is used
Product Details:
- 10 page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
-
- Employee sign off section
- Instant download delivery
|
Concrete Line Pumping Information:
The Concrete Line Pumping Safe Work Method Statement (SWMS) is a comprehensive 10 page procedure outlining the safety steps for the safe delivery of concrete via line pumping.
The Concrete Line Pumping procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Concrete Line Pumping Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
Product Details:
- 10 page procedure
- Written by ex WHS inspectors
- Referenced
- Risk ratings before and after control measures
- MS Word format NOT PDF
- Task specific and site specific details easy to add
- Includes easy to complete boxes for Company details and project details
-
- Employee sign off section
- Instant download delivery
|