Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Industrial Safety >> Concrete Preparation and Laying
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Concrete Safety
1
1 Earth Moving
1
1 Electricians
1
1 Engineering
1
Industrial Safety
1
1 1 Air Compressor (Portable)
.
. . Battery Charging
1 1 Brake Press
1
1 1 Cleaning Stainless Steel Weld with pickling gel
1
1 1 Cut off metal saw
1
1 1 DIY Audit Kit
1
1 1 Drill Press
1
1 1 Dust Extractor
1
1 1 Forklift Petrol/Diesel Safety
1
1 1 Forklift Maintenance
1
1 1 Guillotine Use
1
1 1 Grinder (Freehand)
1
1 1 Hydraulic Press
1
1 1 Incident Report
1
1 1 Job Safety Analysis Worksheet
1
1 1 Linisher
1
1 1 LPG Work Method Statement (Liquid Propane Gas)
1
1 1 Manual Handling (Lifting)
1
1 1 Metal turning Lathe
1
1 1 Operating Power Tools
1
1 1 Oxy Acetylene
1
1 1 Pedestal Drill
1
1 1 Permit To Work
1
1 1 Pipe Bender
1
1 1 Plasma Cutter
1
1 1 Powder coating
1
1 1 Pressure Cleaner
1
1 1 Servicing Engines
1
1 1 Sheet Metal Roller
1
1 1 Steel Construction
1
1 1 Trucks (Loading/Unloading)
1
1 1 Welder (Electric)
1
1 1 Welder Mig
1
1 1 Welder Tig
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Welding Industry
1
1 Welding Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food and Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Concrete Preparation and Laying Work Method Statement

Concrete Preparation and Laying
Example SWMS
Buy Now

The Concrete Preparation and Laying includes:

  • Risk Assessment
  • Personal Safety
  • Formwork And Reinforcing
  • Concrete Truck Safety
  • Finishing Concrete
  • Completion
  • Emergencies
  • Risk Ratings

Product Details:

  • 11 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Download a sample of the Concrete Preparation and Laying Work Method Statement.

Concrete Preparation and Laying Information:

The Concrete Preparation and Laying Safe Work Method Statement (SWMS) is a comprehensive 11 page procedure outlining the safety steps for the safe Preparation and Laying of Concrete.

The Concrete Preparation and Laying procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Concrete Preparation and Laying Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

Concrete Preparation and Laying Safety Notes

  • Fresh concrete has a very powerful caustic effect on skin owing to the alkaline nature of cement. Freshly mixed concrete, mortar, grout and slurry may cause skin irritation including alkaline burning and dermatitis.
  • The abrasive effects of sand and aggregate in the concrete aggravate the condition and effects range from dry skin, irritant contact dermatitis and allergic contact dermatitis to severe burns.
  • These burns can take several hours to occur and can be very painful.
  • Avoid contact with skin by wearing suitable clothing and PVC gloves.


OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012