Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
OHS Systems Work Method
Statements
Safety
Training
OHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Electricians >> Confined Spaces Work Method Statement
Work Method Statements spacer
d
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Engineering
1
1 Concrete Safety
1
Welding
1
Electricians
1 1 Confined Spaces
1
1 1 Electrical Wiring
1
1 1 Job Safety Analysis Worksheet
1
1 1 Ladders
1
1 1 Manual Handling (Lifting)
1
1 1 Power Tools
1
1 1 Vehicle Accident
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
Earth Moving
1 Industrial Safety
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

d

Confined Spaces Work Method Statement or Safe Work Procedure

Confined Spaces Procedure
Confined Spaces SWMS
Buy Now

 

The Safety Procedure includes:

  • Confined Spaces Qualifications
  • Types of Confined Spaces
  • Safety Equipment
  • Risk Assessment
  • Air Quality Standards
  • Standby Person
  • Entrapment
  • Suffocation
  • Emergency Procedures
  • Risk Ratings
  • 4 Page Complete Procedure
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

While Working In Confined Spaces

  • Maintain communication with other fellow workers and the stand-by person
  • Alert the stand-by person of any hazards
  • Understand the rescue and work procedures prior to entrance
  • Exit the confined space quickly when required

 

 

General Confined Spaces Safety Information:

Confined Spaces work has inherient dangers and this four page Safe Work Procedure or Work Method Statement is a vital part of a safe work system.

Working In Confined Spaces Safety Notes

Before Entering Confined Spaces Consider

  • Are there any unusual or specific hazards associated with the confined space  work, such as other workers or working with heat (welding)?
  • Are there any site occupancy restrictions and conditions, including access and egress, work schedules and emergency management arrangements, including emergency communication and evacuation plans?
  • Prior to any work-taking place in the confined space, the space must be naturally ventilated for a minimum period of ten minutes. If satisfactory atmospheric levels are not obtained then forced ventilation must be used until satisfactory gas test results are achieved.
  • Prior to any entry taking place, the atmosphere of the confined space must be tested to comply with the following.
        • Oxygen >19.5% by volume and <23.5% by volume
        • Flammable gas <5% by   volume
        • Hydrogen Sulphide <10 ppm • Carbon Monoxide <30 ppm
  • Confined space signage and barricading is applied at the entry site prior to entering

 



Product Updates: First Name * Last Name * Email *

OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
OHS Auditing

On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES