Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Earth Moving >> Site Demolition Work Method Statement
Work Method Statements spacer
d
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Engineering
1
1 Concrete Safety
1
Earth Moving
Auger Operation
1
Backhoe or Front End Loader
1
Battery Charging
1
1 1 Bob Cat & Skid Steer
1
1 1 Chain Trencher
1
Demolition Work
1
1 1 Dozer Operations
1
1
1 1 Earth Moving Equipment Maintenance
1
1 1 Excavator Auger Attachment
1
1 1 Excavator - Large
1
1 1 Excavator - Mini
1
1 1 Fuel Storage, Handling and Decanting
1
1 1 Grader
1
1 1 Heat Stress
1
1 1 Hitching Mobile Plant
1
1 1 Incident Report Form
1
1 1 Jack Hammer
1
1 1 Job Safety Analysis Worksheet
1
1 1 Large Excavators
1
1 1 Lock-Out Of Plant And Equipment
1
1 1 Manual Handling
1
1 1 Mini Excavators
1
1 1 Motor Grader Operation
1
1 1 Post Hole Digger
1
1 1 Pressure Cleaner
1
1 1 Ride On Drum Roller
1
1 1 Scraper
1
1 1 Stabiliser RM300 and RM500
1
1 1 Tipping Trucks
1
1 1 Traffic Management Plan
1
1 1 Trench Work
1
1 1 Underground Cable Locating
1
1 1 Vehicle Accident Procedure
1
1 1 Wacker Packer
1
1 1 Water Truck
1
1 1 Working Around Electricity
1
1 1 Complete WMS List
1
1 Industrial Safety
1
1 Electricians
1
1 Transport Industry
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs
d

Site Demolition Work Method Statement or Safe Work Procedure

SIte_Safety
Demolition Work SWMS
Buy Now

 

The Safety Procedure includes:

  • Risk Assessments
  • Pre-Planning
  • Site Safety
  • Fall Protection
  • Chutes
  • Lift Boxes
  • Removing Glass
  • First Aid
  • Adjoining Buildings
  • Asbestos removal
  • Task Sequences
  • Site Clean Up and more
  • Risk Ratings
  • MS Word Format
  • This Is Not A Blank Template
  • Multiple page procedure
  • Delivered via email within 2 business hours

Site Safety & Security

  • Warning signs will be erected and checked each day.
          Example “Warning Demolition Work in Progress”.
  • Traffic control, road closures and pedestrian controls will be provided as identified and where required.
  • Perimeter hoarding fencing will be installed as required.
  • Gates will be locked at completion of the work day.

 

General Demolition Safety Information:

Demolition Work can be extremely dangerous and this Safe Work Procedure or Work Method Statement is a vital part of a safe work system.

Safety Culture procedures are Not Blank Templates. Safety Procedures can be edited or customised in MS Word if required.

Demolition Work Safety Notes

Before Commencing Demolition Work:

Ensure:
   Development approval has been granted.
   Approval has been granted from the owner to proceed.
   Building owner has provided a building report of any contained asbestos materials
Review:
   Existing plans (if available) to identify structural systems. If plans are not available consult with a structural engineer.
   Identify the plant and equipment to be used.
Identify:
   Safe means of access and egress to the site and for adjoining buildings and areas such as common use parks.
   Any possible environmental impacts from the demolition.

 


References:

 

 

National Occupational Health and Safety Commission (Now Australian Safety and Compensation Council) National Standard for Construction Work
Queensland – Workplace Health and Safety Regulations 1997
QueenslandDepartment of Employment and Industrial Relations – Information Paper - Approved criteria for a certificate to perform the prescribed activity of demolition work (Information Paper D1)
Victoria – WorkCover Authority – Code of Practice – No 14 - Demolition
SAI Global – AS/NZS 2601-2001 – Demolition of Structures

 


 




OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012