Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Transport Industry >> Drivers Manual
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Concrete Safety
1
1 Earth Moving
1
1 Engineering
1
1 Electricians
1
1 Industrial Safety
1
Transport Industry
1 1 Drivers Manual
1
1 1 Fatigue Management Policy
1
Forklift Diesel
1
1 1 Forklift LPG
1
1 1 Forklift Maintenance
1
1 1 Hiab Crane or Truck Loading Crane
1
1 1 Incident Report Form
1
1 1 Job Safety Analysis
1
1 1 Manual Handling
1
1 1 Transport of Pre Fabricated Houses and Buildings
1
1 1 Truck and Dog
1
1 1 Trucks (Loading/Unloading)
1
1 1 Vehicle Accident Procedure
1
1 1 Complete WMS List
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Welding Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Drivers Manual

Transport Industry
Drivers Manual
($195 plus GST) Buy Now

Driver Manual is suitable for:

  • Heavy Vehicle Drivers
  • Courier Drivers
  • Truck Drivers
  • Delivery Drivers
  • Professional Drivers

This guide includes:

  • Introduction
  • Supervision
  • Identifying & Assessing Health & Safety Risks
  • Planning for Travel
  • Medical Fitness for Travel
  • Preparation for Destination
  • Security
  • Driving
  • Locally Engaged Staff
  • Working in Isolation
  • Climate
  • Personal Activities
  • Natural Disasters/ Extreme Weather
  • Health Risks
  • Travel Health Risks
  • Jet Lag/Hydration
  • Deep Vein Thrombosis (DVT)
  • Remote Locations: Health Risks
  • Traveller’s Diarrhoea
  • Malaria
  • Sleeping Sickness
  • Hepatitis
  • General Precautions to Prevent Tropical Diseases
  • Incident Reporting
  • Return Protocols
  • Hazard Identification, Risk Assessment and Control Form
  • Planning for Travel Checklist

Drivers Manual Information:

This 23 page Drivers Manual has been developed to provide guidance and information for Drivers to assist in the prevention of injury or illness.

Road accidents are the cause of most fatalities in the road transport industry, and Drivers fatigue is often a factor. Workers have also been killed or seriously injured after falling from the top of their trucks while loading, checking or securing goods. More than 80% of severe injuries among road transport workers, however, are sustained while not driving. Most of these injuries are the result of manual handling, slips, trips and falls and being injured during loading/unloading practices involving forklifts.

Product Details:

  • 23 Page Document
  • Written by ex WHS inspectors
  • Referenced
  • MS Word format NOT PDF
  • Employee sign off section
  • Instant download delivery

Related Items:



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012