Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Earthworks - in close proximity to Power Lines and Roadways
Work Method Statements spacer
Safety Work Method Statements navigation
Work Method Statements Safe Work Procedures
Work Method Statements
Work Method Statements
Work Method Statements
Work Method Statements Commercial Construction Industry
Work Method Statements
Work Method Statements Cabinet Makers
Work Method Statements
. Carpentry Industry
Work Method Statements
  Cleaning Industry
Work Method Statements
Site Plan Concrete Safety
Work Method Statements
Site Plan Earth Moving Procedures
Work Method Statements
Site Plan Engineering
Work Method Statements
  Food and Kitchen Safety
Work Method Statements
Work Method Statements Garden Maintenance
Work Method Statements
Site Plan Industrial Safety Procedures
Work Method Statements
Site Plan Electricians
Work Method Statements
. Plumbing Safety
Work Method Statements
. Plastering Safety
Work Method Statements
. Painting Safety
Work Method Statements
. Steel Work Industry
Work Method Statements
. Transport Industry
Work Method Statements
. Welding
Work Method Statements
. Custom Procedures
Work Method Statements
OHS OHS Policies
Work Method Statements
Work Method Statements Online Inductions
Work Method Statements
Work Method Statements OHS System
Work Method Statements
OHS OHS Diary
Work Method Statements
OHS First Aid Kits
Work Method Statements

Earthworks - in close proximity to Power Lines and Roadways Work Method Statement

The Safety Procedure includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • References

Example SWMS
Buy Now

Product Details:

  • 21 Page procedure
  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section
  • Instant download delivery

Related Items:

Earthworks - in close proximity to Power Lines and Roadways Information:

The Earthworks – in close proximity to Power Lines and Roadways Safe Work Method Statement (SWMS) is a comprehensive 21 page procedure.

This SWMS covers general hazards associated with works being conducted in the presence of overhead power lines and in close proximity to roads with public vehicular traffic and railway tracks.

Equipment includes Dozers, Excavators, Graders and road vehicles. This SWMS is to be used in conjunction with SWMS specific to items of plant (Graders, Excavators etc), Confined Space Entry and others as required.

The Earthworks – in close proximity to Power Lines and Roadways procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.

The Earthworks – in close proximity to Power Lines and Roadways Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.

Planning

Overhead power lines (including high and low voltage distribution conductors, single wire earth return (SWER), service cables to premises, communications cables and electrical transformers mounted lower than cables)

Identify:

  • Maximum range of equipment and how close equipment or load can come to asset (known as design envelope)
  • Clearance distances for type of asset (***)
  • Type of asset/cabling (if in doubt contact electrical supplier)
  • Voltage level
  • Height of conductor at lowest point
  • Minimum distance between wires and ground
  • Degree of sag and sway

*** Minimum Clearance zones:

  • High voltage electrical conductors = 2,000mm
  • Un-insulated low voltage conductors = 1,000mm
  • Insulated low voltage (between 50V and 1,000 V) = 500mm
  • Communications cabling = 300mm



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012