|
The Safety Procedure includes:
- PPE
- Safety Notes
- Planning
- Pre-Operational Inspection
- Operation
- Completion and Maintenance
- Emergency Procedures
Inspect Bander - Ensure:
- Instructions for safe use available and legible.
- Controls are labelled and functional
- Power cord undamaged/good condition
- No trip, slip hazards present in work area
- No exposed moving parts
- Guards in place and undamaged (including under-bench guards,
transmission, drive-belts etc)
- All adjusting keys, spanners and tools are removed before
machine switched on
- Flammables/combustibles are kept at least 6m away
- Infeed/Outfeed fences are in good condition and set
correctly for job and locked in place
- Upper and Lower guides are correctly positioned (banding
should be able to slide easily)
Product Details:
- 7 page procedure
- Microsoft Word Format
- Add site specific details and risks
- Make it task specific
- Instant download delivery
|
Edge Bander Information:
The Edge Bander Safe Work Method Statement (SWMS) is a comprehensive 7 page procedure outlining the safety steps for using an edge bander.
The Edge Bander procedure is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall OHS System.
The Concrete Line Pumping Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
The Edge Bander Work Method Statement can be used as part of your OHS inductions, for Tool box talks or tender applications.
References:
- OHS Legislation in all States
- National Standard for Plant [NOHSC:1010(1994)]
- Queensland Code of Practice for Plant
- St. Johns Ambulance – First Aid Advice
- AS 1473 – 1991. Guarding and Safe Use of Woodworking
Machinery
- Carba-Tec, Benchtop Edge Bander (CTEB-401) Instruction
Manual
|