Safety Culture
Safety Culture mail icon   Email Us Safety Culture phone icon  1300 306 604
  • Facebook
  • Twitter
  • Youtube
OHS Systems Work Method
Statements
EnvironmentalOHS AuditsSafety ShopOHS News
nav spacer

Work Method Statements

Work Method Statements spacer
Safety Culture >> Work Method Statements >> Transport Industry >> Fatigue Management Policy
Work Method Statements spacer
1 Residential Construction Industry
1
1 Commercial Construction Industry
1
1 Construction Site Safety Management Plans
1
1 Concrete Safety
1
1 Earth Moving
1
1 Engineering
1
1 Electricians
1
1 Industrial Safety
1
Transport Industry
1 1 Drivers Manual
1
1 1 Fatigue Management Policy
1
Forklift Diesel
1
1 1 Forklift LPG
1
1 1 Forklift Maintenance
1
1 1 Hiab Crane or Truck Loading Crane
1
1 1 Incident Report Form
1
1 1 Job Safety Analysis
1
1 1 Manual Handling
1
1 1 Transport of Pre Fabricated Houses and Buildings
1
1 1 Trucks (Loading/Unloading)
1
1 1 Vehicle Accident Procedure
1
1 1 Complete WMS List
1
1 Plumbing Safety
1
1 Painting Safety
1
1 Steel Work Industry
1
1 Welding Industry
1
1 Carpentry Industry
1
1 Cabinet Makers
1
1 Custom Procedures
1
1 Garden Contractors
1
1 Food And Kitchen Safety
Cleaning Industry
Handyman
1 OHS Policies
1 Complete OHS System
1 OHS Diary
1 Training DVDs

Transport Industry

Safety Culture have developed a Heavy Vehicle Drivers Manual and a Fatigue Management Policy specific to the Transport Industry.

Fatigue Management Policy

For companies that require a simple Fatigue Management Policy in three plain language pages.

This three page OHS Drivers Fatigue Management Policy for Heavy Vehicles covers trip schedule, driving hours in accordance with National Driing Hours Regulation, definitions of what type of work can be conducted, and warning signs of fatigue.

This policy works in conjuction with the 9 page Safety Culture Drivers Manual.

The Fatigue Management Policy was referenced from:

  • National Transport Commission of Australia
  • New South Wales – Workcover Fact Sheets
  • New South Wales - Occupational Health and Safety Amendment (Long Distance Truck Driver Fatigue) Regulation 2005
  • South Australia - Road Traffic (Driving Hours) Regulations 1999
  • Queensland – Transport Operations (Road Use Management – Fatigue Management) Regulations 1998

    Supplied in Microsoft Word Safety Culture Version 4.0

$99.95 plus GST

Back Buy Now

For a complete list of Safe Work Procedures see here.

 



OHS Systems

OHS System - General
Construction OHS
OHS System Audit
Transport Safety
OHS Diary
OHS Equipment Registers
JSA Template
Incident Report Forms
Construction Site Sole Trader
Industrial Sole Trader Pack
Environmental Management Plan (EMP)
Work Method Statements (WMS)

Construction WMS
Residential Construction
Construction Site Safety Plans
Engineering WMS
General Safe Work Procedures
Earthmoving WMS
Custom Safe WMS
Complete WMS List
How to develop a WMS
Free Sample WMS
Safety Training

Online OHS Induction Courses
Safety DVD's
OHS Consultants
Safety Induction
OHS News
Toolbox Talks Resources
BetaGuard Mobile Scaffold
OHS Auditing

Free Audit Templates
On Site OHS Audits
OHS Consulting
Safety Audit
Equipment Safety Audit
Construction Site Audits
First Aid Kits

Portable First Aid Kits
Softpack First Aid Kits
Wallmounted First Aid Kits
High Risk Risk First Aid Kits
Mining Industry First Aid Kits
Construction First Aid Kits
National First Aid Kits

 

ABOUT SSL CERTIFICATES
National Safety Council of Australia (NSCA) Member 2012